Cathodic Protection systems must be tested within how many months of installation?

  1. 3 months

  2. 6 months

  3. 12 months

  4. 24 months

The correct answer is: 6 months

Cathodic protection systems are critical for preventing corrosion in underground storage tanks and related piping. The requirement for testing such systems within a specific timeframe after installation is a crucial part of ensuring their proper functioning and compliance with safety regulations. The six-month timeframe for testing after installation is designed to verify that the cathodic protection system is working effectively and providing the necessary protection against corrosion. This early assessment allows for the detection of any issues in the system, such as inadequate electrical connections or ground faults, which could compromise the protection of the tank. Waiting longer than this period could lead to undetected corrosion damage, which might result in costly repairs or, more critically, environmental contamination. Therefore, regular testing, beginning within six months of installation, is essential for maintaining system integrity and ensuring compliance with regulatory standards aimed at protecting both the environment and public safety.